07-08-2018, 02:20 PM | #1 |
Brigadier General
4944
Rep 4,976
Posts |
Hate to start a new thread on this. But hoping one of you out there with a connection or some insight can point me in the right direction re an M2C allocation in Texas or relatively close. Would be absolutely fine with a later build date as I want to do PCD. Had some good referrals from others on this forum after seeing their posts in other threads, but it has led to being put on a list. I am grateful and don't mind being on a list to maybe get a Q4 allocation, but wanted to cover all my basis and see if I can't get that elusive October build date for MSRP.
Tried to reach out to my contact for years who always gets us great deals but he has a list 20 people long, and I came to game a little late (I know, I know, moron, that's what I get for wanting an M4 but not loving it). Thanks ahead of time for any help. If none, I guess patience is a virtue haha.
__________________
Wife's Car: 2020 X4M Competition, Alpine White on Black Alcantara and Biege
Current Car: 2018 F80 M3CS, SMB, DCT, ZEC, MPE Recently Departed: 2020 F87 M2C, LBB, ZEC, 6MT (Euro Delivery Aug. 29, 2019, totaled by an idiot in a Camry who then ran from the scene) Wife's Prior Car: 2018 F80 M3, Yas Marina Blue, DCT, Black 19s, Carbon Structure Anthracite Cloth/Leather Combination, Driving Assistance Package (Euro Delivery Oct. 9, 2017) |
Post Reply |
Bookmarks |
|
|