09-14-2020, 09:36 AM | #1 |
Captain
1096
Rep 823
Posts |
M2 CS (USA) build dates?
Now that allocations are out, has anyone gotten a confirmed build date from their dealership?
__________________
Garage; 2020 Raptor, 2011 1M, 2017 M2 PE, 2006 Z4 MC, 2007 Z4 MC, 2001 Spec E46, 2007 GT3
|
|
09-14-2020, 09:43 AM | #2 |
Brigadier General
4610
Rep 4,714
Posts |
The only thing I have is a confirmed production number in hand and a week 41 build week. I was told the build week could change. The car status on My BMW moved from "Order Received" to "Scheduled for Production"
|
Appreciate
0
|
09-14-2020, 09:57 AM | #3 |
Mmmm... Bavarian
2129
Rep 1,690
Posts |
I haven't gotten mine into My BMW yet.. I'll have to get on him for that this week. (nevermind... figured it out that you can add tracking with the production number on your own profile)
__________________
M2 CS
2023 CB X5 45e 2018 i3 94 2014 Cayman S |
Appreciate
0
|
09-14-2020, 10:01 AM | #4 | |
Captain
1096
Rep 823
Posts |
Quote:
I did 3 ED's and had to push on everyone.
__________________
Garage; 2020 Raptor, 2011 1M, 2017 M2 PE, 2006 Z4 MC, 2007 Z4 MC, 2001 Spec E46, 2007 GT3
|
|
Appreciate
0
|
09-14-2020, 10:08 AM | #5 | ||
Captain
1096
Rep 823
Posts |
Quote:
__________________
Garage; 2020 Raptor, 2011 1M, 2017 M2 PE, 2006 Z4 MC, 2007 Z4 MC, 2001 Spec E46, 2007 GT3
|
||
Appreciate
0
|
09-14-2020, 10:19 AM | #6 |
Brigadier General
4610
Rep 4,714
Posts |
jhall1957 I'd be curious to hear about your opinion on the depreciation thread. I just noticed that you have two in the garage that I would consider have already hit the resurgence period z4MC. I spoke about the z4M, which I think is on the resurgence cusp.
|
Appreciate
0
|
09-14-2020, 03:45 PM | #10 |
Second Lieutenant
315
Rep 235
Posts |
Mine changed to scheduled for production then went back to order received the next day.. they also changed the cup 2 tires in this time so not sure what's going on at this point.
|
Appreciate
0
|
09-14-2020, 03:45 PM | #11 |
Colonel
2619
Rep 2,819
Posts
Drives: e82 1M, f87 M2cs
Join Date: Nov 2011
Location: Tri-Cities, Washington
|
My build has been scheduled for 11/2-11/8. That's later than I hoped, so I am asking them to take the Cup2's off the order since they could be ruined by winter transport.
Rumor has it we get the PS4S otherwise (not definitively confirmed) which I have on my 1M for daily, and they are perfectly capable.
__________________
1M track toy mods: BMS chargepipe, BMS OCC, ADE FMIC, ADE motor mounts, MadDad/Lightweight Ti exhaust, ADE custom oil thermostat/cooler, custom MHD tune, F10 550i clutch, Ohlins R+T, Vorschlag camber plates, M3 'vert FSB with Turner endlinks, Stoptech Trophy BBK.
|
Appreciate
0
|
09-14-2020, 06:54 PM | #12 | |
Brigadier General
1731
Rep 3,654
Posts |
Quote:
|
|
Appreciate
0
|
09-15-2020, 02:37 AM | #14 |
Major
409
Rep 1,349
Posts |
US spec builds thus far have come with Super Sports if you don't opt for Cup 2s. I'll be installing the PS4S for the winter and putting the Cup 2s in the basement to keep them at proper temps.
__________________
21 BMW X5 xDrive40i
20 BMW M2 CS 19 Mini Cooper S Countryman ALL4 6MT |
Appreciate
0
|
09-15-2020, 06:55 AM | #15 | |
Brigadier General
4610
Rep 4,714
Posts |
Quote:
It is interesting that the German deliveries get PSS for US spc. I believe China gets the PS4S. |
|
Appreciate
0
|
09-15-2020, 08:22 AM | #16 | |
Colonel
2619
Rep 2,819
Posts
Drives: e82 1M, f87 M2cs
Join Date: Nov 2011
Location: Tri-Cities, Washington
|
Quote:
__________________
1M track toy mods: BMS chargepipe, BMS OCC, ADE FMIC, ADE motor mounts, MadDad/Lightweight Ti exhaust, ADE custom oil thermostat/cooler, custom MHD tune, F10 550i clutch, Ohlins R+T, Vorschlag camber plates, M3 'vert FSB with Turner endlinks, Stoptech Trophy BBK.
|
|
Appreciate
0
|
09-15-2020, 08:50 AM | #18 |
Captain
1096
Rep 823
Posts |
Where are you guys getting production weeks/dates?
My BMW just shows mine as "Scheduled For Production" and then below says "The factory has scheduled production of your unique BMW".
__________________
Garage; 2020 Raptor, 2011 1M, 2017 M2 PE, 2006 Z4 MC, 2007 Z4 MC, 2001 Spec E46, 2007 GT3
|
Appreciate
0
|
09-15-2020, 08:55 AM | #19 |
Colonel
2619
Rep 2,819
Posts
Drives: e82 1M, f87 M2cs
Join Date: Nov 2011
Location: Tri-Cities, Washington
|
My CA told me the dates. When I log into myBMW, it just says "Scheduled for production" with no dates.
__________________
1M track toy mods: BMS chargepipe, BMS OCC, ADE FMIC, ADE motor mounts, MadDad/Lightweight Ti exhaust, ADE custom oil thermostat/cooler, custom MHD tune, F10 550i clutch, Ohlins R+T, Vorschlag camber plates, M3 'vert FSB with Turner endlinks, Stoptech Trophy BBK.
|
Appreciate
0
|
09-15-2020, 08:59 AM | #20 |
Lieutenant Colonel
1943
Rep 1,552
Posts |
my build sheet shows 'c-46-24024'
assume that may mean week 46.
__________________
2020 M2 CS, 2018 M3 CS, 2016 M4 GTS, 2013 M3 LRP, 2011 1M, 2011 M3 GTRS3, 2004 M3, 2002 M3, 2000 M Coupe, 2002 M5, 1997 M3, 1988 M3, 2022 STO, 2020 Urus, 2022 TRX, 2022 392, 2021 SVJ, 2018 Performante, 2013 Gallardo 550-2, 2012 Gallardo STS, 2018 R8 RWS, 2012 R8, 2017 G550 4X4^2, 2015 GT3, 2015 Continental GT3R, 1971 Bronco
|
Appreciate
0
|
09-15-2020, 10:44 AM | #21 |
Mmmm... Bavarian
2129
Rep 1,690
Posts |
I've been trying to tease out of the delivery tracking master thread the actual time it takes to get the car from build date, and trying to remember from when my 335 was built. Here's what I've been adding up for myself in the midwest based on the info provided previously:
Build start (150) to build finish (155): 1-2 weeks. -Build finish (155) to Scheduled for Carrier (182): 1 day. -Status 182 to 190 (on a train to bremerhaven):1-3 days. -Status 190 to 193 (at port awaiting a ship): 1-2 days. -Status 193 to 195 (on a ship): 3-5 days for east coast delivery, -Shipping time from Bremerhaven to East Coast: 12-17 days depending on the number of stops. --Offload at port: 1 day -Processing through customs: 1-2 days -Process through BMW Vehicle Processing Center (VPC) and onto a carrier: 2-5 days. -Shipping time on carrier to Dealership: 1-4 days. So on the long side - ~54 days/8 weeks) and short side ~30 days/4 weeks. I've been mentally assuming about 6 weeks from build start, so if Week 41, then in my hands week of November 16th. (Found my original build sheet/production number on my 335 and it was almost exactly 8 weeks from status 112 to in my hands)
__________________
M2 CS
2023 CB X5 45e 2018 i3 94 2014 Cayman S Last edited by sdhotwn; 09-15-2020 at 10:50 AM.. |
Appreciate
1
cncmastr1591.50 |
09-15-2020, 11:13 AM | #22 | |
Major
1498
Rep 1,297
Posts |
Quote:
|
|
Appreciate
0
|
Bookmarks |
|
|