Quote:
Originally Posted by Dinan_Engineering
The callibration is done. Just waiting for it to go through our newly required internal emissions testing protocols. While we have used a sister company in the past to assist with this process the equipment/fuels needed have been slowly arriving at our location in Alabama over the last few weeks so we can do it ourselves going forward. Will temporarily be having one of our dynos doing double duty but we are also in the process of adding a 5th dyno that will be dedicated to emissions testing. Last I heard we were hoping to have everything up an running internally in the next 30 days so a public release of stage 2 would probably be in the Halloween to Thanksgiving range.
That said, power wise its only a small step up from stage 1 as the biggest limiting factor is still fueling on the platform.
|
Hey Dinan do you have an update on this?
Thanks in advance