View Single Post
      10-06-2017, 08:08 PM   #76
Nezil
Major
Nezil's Avatar
1403
Rep
1,466
Posts

Drives: LCI '18 6MT M2
Join Date: Jul 2017
Location: San Francisco Bay Area

iTrader: (0)

Quote:
Originally Posted by Motivate View Post
Hmm, my CA is telling me that we'll get a production number when the car goes into production. Something doesn't sound right?
Doesn't sound right to me...

OK, so your CA should be able to give you an actual status. The important ones for you at this point are:

0 Order deleted by NA
17 Order not Specified
37 Order is at BMW NA
87 Production Week Assigned
97 Order sent to AG
100 Order deleted by AG
101 Error in data transmitted
102 Special Order (no Prod Week)
105 Order out of Prod. Period
111 Order Accepted at AG
112 Order scheduled for Production

A production order is in status 87 until it's an order. It moves to 97 when your CA sends the order to BMW in Germany, and moves to 111 when BMW Germany accepts it. I believe that it's at this point that it gets a production number.

You can see on my timeline in my signature that mine moved from 97 to 111 in the space of a day. I was traveling at the time in Europe, so it may have been shorter than 24 hours, but that's the time I checked.

It sounds to me that your CA doesn't have an available allocation, and is stringing you along until he/she does.
__________________
2018 ///M2 LCI, LBB, 6MT...

Current Performance Mods:
CSF FMIC, ER CP, Fabspeed Cat, Aquamist WMI, GFB DV+, NGK 97506, BM3 (Stage 2 93 OTS), CDV delete, UCP, M2C/M3/M4 Strut Brace, M3/M4 Reinforcement Rings

Last edited by Nezil; 10-06-2017 at 08:14 PM..
Appreciate 0