Quote:
Originally Posted by themightyshrek
Regarding the price, it looks like 30% more for the base CS, without optional CCB (~9000€), DKG (~3000€), etc.
|
Your calculation is inaccurate. 61.900 + 30% = 80.400 | 61.900 + 45.40% = 90.000.
And it's "circa". Surfaced quotes all range between 90K and 95K (
i.e. 45.40% to 53.47% extra | roughly 2 M2 CS for the price of 3 M2C).
On the side of the data sheet, M2 CS prices are indicated of M-CCB (€7900) and M-DCT (€3900). Hence, the circa €102.000 indicated for base price + M-CCB + M-DCT.