Quote:
Originally Posted by M2bean
so ever since I got a production number last week I've been on top of mine. it's at status 153 since Saturday, but when I call the 1-800 number it says estimated completion date is 4/14. what exactly is that date? if it's in assembly, everyone I've spoken to said it should actually be done by the end of the week. if that's the case, what is this 4/14 nonsense, is that when it can expect to be ready to get on a boat? I've seen a lot of other people say theirs was going to the port 2-3 days after rolling off the assembly line. why would mine take so much longer?
|
nobody has any idea? it's been at status 153 since Saturday per the 1800 number but it's still saying 4/14 for completion. I might go crazy if it takes that long just to get through assembly!