My dealer told me my car arrived at Halifax on May 28th as well, so I'm very curious to know myself but I do have a MPE option awaiting installation.
Also, the timeframe my dealer gave me was June 24-27th
Quote:
Originally Posted by bimmerdriver2
The Don Juan left Halifax on May 29th. How many days from the 29th is reasonable to expect for the car to be in the CN system, considering there are no port installed options (at least none that I'm aware of)?
|