View Single Post
      07-23-2016, 07:40 AM   #8
omasou
Brigadier General
omasou's Avatar
United_States
2088
Rep
3,006
Posts

Drives: BMWs
Join Date: Apr 2016
Location: US

iTrader: (4)

Garage List
2023 BMW S1000RR  [0.50]
2022 BMW F900XR  [3.00]
2022 BMW X6 40i  [0.50]
2020 BMW M2C  [9.50]





















2019 M2C
2017 M2
Status
Description
2019,??,??
2016,03,07
047
order bank request entered
2019,04,18
2016,06,15
111
order accepted at AG, Priority 1 (Customer Sold)
2019,04,25
2016,07,12
112
scheduled for production
2019,05,06
2016,07,28
150
production begins
2019,05,07
2016,07,29
151
exterior body assembly begins, VIN assigned
2019,05,07
2016,07,29
152
entry paint shop
2019,05,15
2016,08,12
153
entry assembly
2019,05,16
2016,08,12
154
assembly
2019,05,16
2016,08,12
155
assembly finish/quality check
2019,05,16
2016,08,12
160
vehicle handover to sales
2019,05,16
2016,08,12
181
handover to distribution
2019,05,16
2016,08,12
182
handover to carrier/load assignment
2019,05,17
2016,08,15
190
dispatched from AG
2019,05,20
2016,08,16
193
arrived at port or compound
2019,05,22
2016,08,23
195
shipped from port of exit (Marine Traffic)
2019,06,09
2016,09,08
196
shipment arrival - ATA
2019,06,11
2016,09,12
???
VPC prep complete / carrier released (truck not assigned)
2019,06,12
2016,09,16
???
Dealer arrival / dealer prep complete
2019,06,??
2016,09,17
???
Delivery


NOTE: Production Dates section specifies confirmed build week 32. The car entered assembly and finished on August 12 which is week 32 when week 1 starts on January 3.

NOTE:
  • Holds: Not sure if, HOLDS is where BMW would note something like the diff hold?
  • Holds: is no longer valued and diff hold is over. Not sure if there is a relationship here or not.
Attached Images
      

Last edited by omasou; 06-12-2019 at 09:17 AM..
Appreciate 2
WaMi61.50