View Single Post
      08-26-2020, 10:05 PM   #27
Jimjamz
Colonel
Jimjamz's Avatar
Australia
4573
Rep
2,203
Posts

Drives: G81 M3 Touring (Frozen Black)
Join Date: Dec 2012
Location: Australia

iTrader: (0)

Garage List
Quote:
Originally Posted by Davil View Post
Quote:
Originally Posted by medphysdave View Post
Quote:
Originally Posted by RPM33 View Post
If production is coming in September, wouldn't allocations also happen in September?
I was told 6 weeks from start of production to delivery with deliveries taking place Nov and Dec. If you use Nov1 as a start of delivery, then production for US cars would have to start mid September. I believe there is a holiday shutdown in October. That would put all allocations coming out early September, or they come out on a rolling basis where dealerships are notified at the time of their production slot.

South Africa is supposed to take delivery of their 30 cars the end of December. Those are RHD models. Built already, maybe? Produced after US production? I can't imagine they flip flop RHD/LHD production?
Australia is RHD, probably same spec as South Africa, Japan etc and these are being built in October.
I was told end of Jan delivery for Australia
Appreciate 0