Quote:
Originally Posted by M2guru
Ended up separating the hot and cold side, putting the cold side in from the bottom, followed by the hot side from the bottom. Will then add the EWG and BOV/CBV. Returned the recirc BOV/CBV for the daul valve, so awaiting for that to arrive next.
|
How much power are you targeting with this for track work?